Supply and Installation of a 100kW Solar Inverter System

Tender Request for Quotation (RFQ)

For the Supply and Installation of a 100kW Solar Inverter System

Project Location:
Matura Agro Resources Ltd.
Processing Plant, Hadejia, Jigawa State, Nigeria


Overview:

Matura Agro Resources Ltd. invites qualified vendors to submit quotations for the supply and installation of a 100kW solar inverter system for its processing plant located in Hadejia, Jigawa State. The objective of this tender is to establish a reliable and sustainable power supply for the processing plant, utilizing renewable solar energy.

The tender is open for 1 week from the date of this announcement. Interested vendors should provide detailed quotations covering all aspects of the supply, installation, and commissioning of the solar system.


Scope of Work:

The required scope includes, but is not limited to, the following components:

  1. Supply of Solar Panels:
    • Provision of high-efficiency solar panels with a combined capacity of 100kW.
    • Specification of the type, brand, and expected lifespan of the panels.
  2. Inverter System:
    • Supply and installation of a 100kW inverter system that converts solar energy into usable power for the processing plant.
    • Specification of the inverter type, brand, and capacity.
  3. Battery Backup and Storage (Optional):
    • If proposed, the supply of energy storage systems (batteries) to ensure uninterrupted power supply during low sunlight conditions.
    • Specification of battery type, capacity, and expected lifespan.
  4. Mounting and Structural Components:
    • Installation of suitable mounting systems for solar panels, ensuring optimal positioning and durability.
    • Provision of all necessary wiring, cabling, and connectors.
  5. Power Connection and Distribution:
    • Connection of the solar inverter system to the processing plant’s electrical grid.
    • Integration with existing power sources (if applicable) and the ability to switch seamlessly between solar and other power sources.
    • Installation of meters and monitoring systems for tracking power usage and system performance.
  6. Additional Setup Costs:
    • Transportation, labor, and installation costs.
    • Any other components or expenses required for the full functionality of the solar system.

Quotation Requirements:

Vendors must include the following details in their submission:

  • Detailed Breakdown of Costs:
    • Solar panel costs (including quantity and unit price).
    • Inverter system costs.
    • Mounting systems, wiring, and labor costs.
    • Optional components (e.g., battery backup systems).
    • Transportation and miscellaneous costs.
  • System Specifications:
    • Detailed specifications of the proposed solar panels, inverters, and optional battery systems.
    • Expected efficiency, lifespan, and warranty details for all components.
  • Project Timeline:
    • Delivery time for all materials and equipment.
    • Installation schedule with key milestones and estimated time for completion.
  • Warranty and Maintenance:
    • Warranty period for the solar panels, inverters, and other components.
    • Availability of maintenance and after-sales support services.
  • Company Information:
    • Company profile, relevant experience in solar installations, and portfolio of similar projects.
    • Valid business registration certificates and licenses.
  • Payment Terms:
    • Proposed payment schedule.

Submission Details:

  • Submission Deadline: The tender is open for 1 week from October 9, 2024. All submissions must be received by the close of business on October 17, 2024.
  • Submission Method:
    Please submit your quotations electronically to the following email: [insert email address]
    Subject Line: RFQ for 100kW Solar Inverter System – Matura Agro
    Alternatively, hard copy submissions can be delivered to our office at:
    Matura Agro Resources Ltd., N0 10 Onitsha Crescent, Area 11, Garki, Abuja.

Evaluation Criteria:

Quotations will be evaluated based on the following factors:

  • Cost-effectiveness: Competitive pricing and clear breakdown of costs.
  • Technical Proposal: The proposed solution’s ability to meet the project’s technical and operational needs.
  • Experience: Demonstrated experience in solar energy installations of similar size and capacity.
  • Timeline: Ability to complete the project within the desired timeframe.
  • Warranty and After-Sales Support: Quality of warranty and maintenance services.

Additional Information:

Should you require any further information or clarification regarding the tender, please feel free to contact us at:
Email: info@matura.ng


Disclaimer:

Matura Agro Resources Ltd. reserves the right to accept or reject any or all submissions, and to request additional information or clarification from bidders if necessary.

This is a staging environment